Wind Generation Project Acceptance Testing

< Back to projects

Location: Northwestern US

POWER performed acceptance testing of a wind generation project at a 230-115 kV substation. This fast-paced project required that the substation and generators both be online in a short period of time. The control panels in the substation required extensive field wiring modifications to conform to the wiring schematics and connection drawings. POWER provided acceptance testing for 230 kV equipment, 115 kV equipment, 34.5 kV equipment, protective relays and station equipment. POWER successfully energized the equipment in the required timeframe.