fbpx

AES Masinloc Pulverized Coal Fired Plant

< Back to projects

POWER Engineers performed a Feasibility Study considering several options for adding generating capacity at the existing 2 X 300 MW pulverized coal (PC) AES Masinloc Project in the Philippines.  Technologies evaluated on a life cycle cost basis included 2 x 300 MW subcritical PC or CFB units, and a single 600 MW supercritical PC; all configurations included seawater scrubbers.  The study also provided a detailed capital and operating cost estimates.