fbpx

815 MW Paiton IIIP Plant Service Upgrade of Fly Ash Piping, Compressor Piping, and Return Water Piping

< Back to projects

Client: PT Paiton Energy 
Location: Indonesia

POWER Engineers performed the detailed engineering design to upgrade the 815 MW Paiton III unit’s fly ash piping, air compressor piping, and miscellaneous cooling return water piping.  The scope of work entailed a site survey of the existing equipment, routing of piping on existing structures, preparation of a detailed design, and the delivery of the detail design to contractor for installation.