Babcock & Brown, Sweetwater IV Wind Farm, Texas
< Back to projects

Client: Babcock & Brown
Location: Texas, USA

Babcock and Brown initiated the expansion of the existing Sweetwater Wind development to add 135 MW of wind generation. POWER Engineers was responsible for the complete electrical design of the 135 x 1 MW Mitsubishi turbine farm. In detail, POWER Engineers provided engineering for the complete 34.5 kV underground and overhead collection system, 34.5/345 kV substation, SCADA and protective relaying, and the 345 kV transmission line connecting expansion to the existing switchyard infrastructure.